24 Steet Street
FOOTSCRAY · NETWORK
ALL SHEETS
START HERE
The site
OVERVIEW
How it all connects
BUILDING A — THE MAIN HOME
Ground floor
Upper floor
The passage cabinet
Cabinet equipment list
BUILDING B — THE GRANNY FLAT
Cabling schedule
BUILDING C — BBQ, STORE & SERVER ROOM
Cabling schedule
The server room
Server room equipment list
SYSTEM CHAIN
How the equipment connects
From the street to the last device. Everything in the shaded band lives in
Building C’s server room
.
24 STEET ST
FOOTSCRAY
BUILDING C — SERVER ROOM
Street
NBN fibre
NTD
NBN’s box
4 × UNI‑D ports
UNI‑D 1 ⋅ RJ45
GATEWAY
UDM Pro Max
+ 2 × 8 TB, mirrored
records the cameras
SFP+ ⋅ DAC 10G
SWITCH
USW‑Pro‑48‑PoE
power + data to
everything below
FOBOT → F‑01 fibre
to Building A — the passage cabinet
PATCH PANEL
17 cables — C’s and B’s outlets, APs, cameras
ACCESS HUB
drives C’s door and B’s
READER PORTS
2 keypads — C’s door and B’s
TERMINAL STRIP
6 runs — exit sensors, door sensors, strikes
UNI‑D 2 — spare, held for a tenant’s own service (VLAN 901)
POWER
UPS
holds up the gateway, the switch and the hub — so Building B rides through too, since it has none of its own.
Hub battery
keeps the doors working past the UPS, once it runs down. Every door still keeps a mechanical key override.
← PREVIOUS
Start here
NEXT →
Ground floor